Inspection Estimate Builder BOQ EDC Report Sample Reports Sign In
Inspection Estimate Builder BOQ EDC Report Sample Reports Sign In
Akai Renga Pty Ltd · AIQS Certified Quantity Surveyor No. 9497 New South Wales

A quantity surveyor's report,
without the three-week wait.

ClearCost turns your plans or inspection report into a certified quantity surveying document — costed, signed and ready to use. Three reports, one place. You see the numbers in a free preview before you decide whether to buy anything.

Three reports. One quantity surveyor.

01 / Reports
01
Buyers & owners · AS 4349.1 inspection reports

Building Inspection Cost Estimate

You have a building inspection report full of defects and no idea what any of it costs to fix. Upload it and every defect comes back costed, line by line.

  • Full defect schedule with locations
  • Low & high repair cost range per defect
  • Total repair cost estimate (ex GST)
  • QS-certified and independent of any builder
Input: inspection report PDF · Ready in 1–3 min
$55Incl. GST · per report
Start free preview View sample report
02
Builders · alts & adds and new builds

Detailed Bill of Quantities

A tender-ready BOQ measured straight off the drawings and priced at rates for the project's location — the document you'd normally wait a fortnight and pay thousands for.

  • Sectional cost summary across 25+ trades
  • Description / Quantity / Unit / Rate / Total
  • Preliminaries, supervision & site management
  • Builder's margin, GST and cost per m²
  • Inclusions & exclusions schedule
Input: architectural plans + consultant sets · Ready in 2–5 min
$295Incl. GST · per BOQ
Start free preview View sample BOQ
03
Architects, developers & owners · NSW development applications

Estimated Development Cost Report

The cost report your council asks for on a NSW development application — issued in the Standard Form, prepared and signed by an AIQS Certified Quantity Surveyor, and ready to lodge on the NSW Planning Portal.

  • Part 1 — Standard Form Report for the consent authority
  • Part 2 — Detailed Calculation Schedule (commercial-in-confidence)
  • GFA schedule by level, professional fees, statutory costs
  • QS certification & signature block
AIQS Practice Standard 2nd Ed · s 6 EP&A Regulation 2021 (NSW) · PS 25-004
$895Incl. GST · per report
Start free preview View sample report
04
Anything the three above don't cover

Talk to the quantity surveyor

Commercial or staged projects, progress claims, replacement cost assessments, expert witness and dispute work, or a scope that doesn't fit a standard template. Send the details and you'll get a straight answer on whether it's something we do and what it costs.

Direct to Gordon Xue · AIQS Certified QS No. 9497
CustomQuoted per job
Email an enquiry hello@clearcost.au

You see the numbers before you pay.

Every report starts with a free preview. Upload your file, get the headline figures back in minutes, and only pay if you want the full signed document. No account, no subscription, no minimum engagement, and nothing charged to find out.

Pick a report →

How it works

02 / Process
01 Upload Drop in your architectural plans or your building inspection report. PDF, up to 50 MB. Nothing to sign up for.
02 Preview, free Costs come back in 1–5 minutes and are shown on screen. If the numbers aren't what you need, you close the tab and you've paid nothing.
03 Pay & download Pay on this site through Stripe and the signed PDF downloads immediately on the same page. Your receipt is emailed by Stripe.

Why this is a real report, not a generated guess

03 / Credentials
Who prepares it
  • AIQS Certified Quantity Surveyor — Member No. 9497
  • Akai Renga Pty Ltd — ABN 27 164 719 073
  • Every report carries a QS certification and signature block
  • Estimated Development Cost reports prepared under the AIQS Practice Standard 2nd Ed, s 6 EP&A Regulation 2021 (NSW) and Planning Circular PS 25-004
  • Building inspection cost estimates read against AS 4349.1 inspection reports
See it before you trust it
  • A full sample of every report is downloadable — same format, same detail, representative data
  • Free preview on every report, so you see the real figures for your own project first
  • Payment is taken on clearcost.au and secured by Stripe
  • Your download stays live on the page — no waiting on an email

Against the traditional route

04 / Comparison
Engaging a QS the usual way vs. ClearCost
Traditional QS engagement
$1,500–$5,000
5–10 business days · per report
  • Phone calls, scoping meetings, follow-ups
  • Manual takeoff and pricing across days
  • Minimum engagement fees on small jobs
  • You commit before you see a single number
ClearCost
$55 · $295 · $895
1–5 minutes · pay per report
  • Upload, preview free, decide after you've seen the costs
  • AIQS-certified QS, rates by project location
  • No subscription, no minimum, no scoping call
  • Signed PDF downloads on the spot

Questions people ask before their first upload

05 / FAQ
Do I have to pay before I see anything?
No. Every report starts with a free preview — you upload your file, the costs come back on screen within a few minutes, and you only pay if you want the full signed PDF. If the numbers aren't useful to you, you've spent nothing.
Is this actually certified, or is it an AI estimate?
Both, and we're upfront about it. The draft calculations are produced with the assistance of AI tooling, and the report is then issued under the certification of an AIQS Certified Quantity Surveyor (Member No. 9497), with a certification and signature block. That's what makes it fast and what makes it stand up. Estimated Development Cost reports are prepared under the AIQS Practice Standard for Construction Cost Assessments (2nd Ed) and NSW Planning Circular PS 25-004. Download a sample and see exactly what you'd receive.
Will my council accept the report?
The Estimated Development Cost report is issued in the Standard Form required for NSW development applications, prepared in accordance with s 6 of the Environmental Planning & Assessment Regulation 2021 (NSW) and Planning Circular PS 25-004, and comes as the two parts councils expect — Part 1 for the consent authority and Part 2 as the detailed calculation schedule.
How long does it take?
Building inspection cost estimates and Estimated Development Cost reports typically run 1–3 minutes. A detailed BOQ takes 2–5 minutes because there's considerably more to measure. You stay on the page while it runs.
What do I need to upload?
For a building inspection cost estimate, your building inspection report as a PDF. For an Estimated Development Cost report, your architectural plans. For a BOQ, architectural plans are the minimum — the more consultant sets you include (specifications, hydraulic, stormwater, electrical, survey, structural, mechanical), the more accurate the result.
What happens to my plans after I upload them?
They're used solely to prepare your cost document. Uploads are transmitted securely and analysed with AI tooling to extract quantities and draft the calculations, then issued under QS certification. They are never sold, and ClearCost does not use them to train models. Reports and job data are retained on our hosting so you can re-download and get support — and if you'd rather they weren't, email hello@clearcost.au and we'll delete them. Card details never touch our systems; Stripe handles payment end to end. Full privacy policy →
What if the report isn't right?
If a report fails to generate or download after payment and we can't deliver it, you get a full refund. If it contains a material error caused by our process rather than by the documents supplied, we correct and reissue it, or refund it. Duplicate charges are refunded immediately. Email hello@clearcost.au with your report reference within 14 days. Your rights under the Australian Consumer Law aren't limited by any of this. Full refund policy →

Start with the free preview.

Upload your plans or inspection report and see your costs before you decide anything. Or download a sample report first and take your time.

Choose a report Samples