Inspection Estimate Builder BOQ EDC Report Sample Reports Sign In
Inspection Estimate Builder BOQ EDC Report Sample Reports Sign In
Builders · Detailed Bill of Quantities Building Cost Estimate

Detailed BOQ for builders,
ready in minutes.

Upload your architectural plans for a fully line-itemised Bill of Quantities — measured by trade, priced at rates for the project location, with builder's margin, GST and cost-per-m². Inclusions and exclusions itemised at the end.

What you get for $295
  • Sectional cost summary across 25+ trades
  • Description / Quantity / Unit / Rate / Total
  • Preliminaries, supervision & site management
  • Builder's margin, GST and cost per m²
  • Inclusions & exclusions schedule
Before you pay anything
  • The preview is free — you see the figures first
  • No account, no subscription, no minimum
  • Signed PDF downloads on this page, not by email
  • Payment on clearcost.au, secured by Stripe
View a full sample report →
01Upload Plans
02Preview Costs
03Download BOQ
Drop all project PDFs here
Architectural · Specifications · Hydraulic · Stormwater · Electrical · Survey
Multiple PDFs · up to 50 MB each · No Account Needed
Tick the document types you've included
Architectural plans are required. The more consultant sets you include, the more accurate the BOQ.
Rates are held at a Sydney base and indexed to the project’s own capital city using the AIQS Building Cost Index, June 2026, with a country loading outside the metropolitan area. Leave blank to use the address shown on your drawings.
Something went wrong
AIQS Certified QS
Tender-Ready BOQ
Results in 2–5 Min
Secure & Private
Why Builders Switch to ClearCost
Traditional QS Engagement
$1,500–$5,000
5–10 business days · per BOQ
  • Phone calls, scoping meetings, follow-ups
  • Manual takeoff and pricing across days
  • Minimum engagement fees on small jobs
ClearCost
$295
2–5 minutes · pay per BOQ
  • Upload plans, BOQ ready while you wait
  • AIQS-certified QS, rates by project location
  • No subscription, no minimum, no scoping call
Building your BOQ…
Uploading your plans…
Typical run time 2–5 minutes
Sub-Total
Trades 01–29
Builder's Margin
@ 15%
Cost per m²
Ex GST
Total ex GST
GST (10%)
Total inc GST
Sectional Cost Summary Unlock to view amounts →
Full Detailed BOQ PDF Line-Itemised · Tender-Ready
Cover · Executive Summary · Sectional Cost Summary · Detailed BOQ by Trade · Quantity / Unit / Rate / Total · Sub-Total · Builder's Margin · GST · Cost Per m² · Inclusions · Exclusions · QS Certification · AIQS Member No. 9497
Detailed PDF — Tender, Pricing & Pre-Construction Ready
Secure Payment

Your BOQ downloads instantly after payment is confirmed.

Secured by Stripe

Payment confirmed

Your BOQ is downloading now

Download BOQ Again
Didn’t save? This button stays live on this page.
Need a hand? hello@clearcost.au · Stripe emails your receipt.